Skip to content

Credentials

What we are licensed to do, and what we are not

Everything below is transcribed from a document that can be produced on request. Where an activity requires a licence FSWS does not hold, that is stated rather than left to be discovered.

Consent to operate

Consolidated Consent to Operate and Authorisation

Granted by the Uttarakhand Pollution Control Board, Regional Office, Roorkee, on 24 April 2025. Issued under:

  • Water (Prevention and Control of Pollution) Act, 1974
  • Air (Prevention and Control of Pollution) Act, 1981
  • Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016
CAF ID
23387
Application
2652160
Valid to
31 March 2030

Consented capacity

The figures we publish are the ones on the consent

These are authorised capacities from the product schedule, not throughput estimates. Actual monthly volumes are reported per client against weighments.

Composting
600 MT
per month
Compacting and grinding of plastic waste
100 MT
per month

Scope

Licences held by others

Where FSWS is not the licensed party, the licensed party performs the recovery and issues the certificate. FSWS forwards it unaltered, with the consignment reference attached.

Plastic waste recycling
Requires registration under the Plastic Waste Management Rules, 2016. Recycling is performed by a registered recycler, who issues the certificate.
E-waste and battery recycling
Performed by authorised recyclers, who issue the certificate. FSWS collects, grades and transfers under traceable custody.
Paper repulping
Performed at the receiving mill, which issues the end-use certificate.

Registration

Registered name
FirstSources Waste Solutions Private Limited
CIN
U37100UR2019PTC010043
GSTIN
05AADCF8128L1ZG
Udyam registration
UDYAM-UK-06-0004657
Facility
SIDCUL, Haridwar, Uttarakhand

Retained per consignment

  • Weighment slips from the collection site and from Haridwar
  • Delivery documents and e-way bills
  • Inward receipt and segregation record
  • Dispatch invoice and weighment to the processor
  • Processor acknowledgement
  • The certificate issued, and its covering reference

The Haridwar facility and the consignment records are open to inspection. Visits to a receiving mill or recycler can be arranged. Copies of the consent, and of downstream partners’ registrations, are provided on request and reissued on renewal or change of partner.

Request documents

Due diligence questions are usually quicker on a call than by email. +91 90688 55443.

Talk to us