For factories at SIDCUL Haridwar
What we collect, and what we buy
We do not collect hazardous or biomedical waste.
We collect
Boiler ash removal
Boiler and fly ash lifted by tractor-trolley, weighed at your gate and pressed into EcoBricks at Haridwar.
How it worksWe collect
ETP sludge removal
Non-hazardous ETP sludge and process waste such as potato peel, lifted and weighed at your gate.
How it worksWe collect
Canteen and garden waste
Food, garden and housekeeping waste lifted by a dedicated tractor-trolley. Food and green waste are composted into TerraVita.
How it worksWe buy
Factory scrap buying
Cardboard, iron, drums, plastics, wood and aluminium, bought per kilogram or per piece.
How it works
Clients
Customers we have served
Every consignment is weighed at both ends, routed to a named end use, and closed with a certificate from the party that did the work.







Record
Chain of custody
Six points between collection and certification. Weights are reported against four routes separately, reused, recycled, recovered and disposed, rather than as a single diversion figure.
- 01
Weighed at source
Weighed and signed off at the collection site before loading.
- 02
Transported
Moved against a delivery document, with an e-way bill where the consignment value requires one.
- 03
Re-weighed on arrival
Weighed again at Haridwar. Any variance against the source weight is recorded.
- 04
Segregated
Sorted to stream. Contaminants, moisture and foreign material are recorded by weight.
- 05
Dispatched
Sent to the named mill, recycler or FSWS production line against invoice and weighment.
- 06
Certificate issued
By whichever party performed the recovery, referenced to the weights above.
Output
What the material becomes
Two streams do not leave Haridwar as waste at all. Ash is pressed into masonry, green waste is composted. Both are consented processes, and both are why the end use can be named rather than estimated.

Industrial ash
EcoBricks
Masonry units pressed from boiler ash and an FSWS binder. The line is cold pressed and ambient cured, so no firing fuel is consumed.

Industrial ash
TerraPots
Planters pressed from the same ash and binder mix as the masonry units, in a range of shapes and sizes for gardens and landscaping.

Horticulture and green waste
TerraVita
Compost produced from green waste, dry leaves, cow dung and canteen waste using a proprietary bacterial culture. Composting is a consented process at the Haridwar facility.
Due diligence
Questions we are asked
Next step
Tell us the site, the streams and the volumes